Design of storm sewer networks of a pre-trial detention facility for 1000 places at 130 Gudovantseva str., Kazan
[engineering surveys]
[obtaining technical specifications]
[environmental assessment]
[draft right-of-way with withdrawal from forest lands]
[project stage P and W]
[passing the state examination]
Design of river water pipelines from bb-34, bb-35 to the main building of Kazan BTS chpp-3
[engineering surveys]
[obtaining technical specifications]
[environmental assessment]
[draft right-of-way with withdrawal from forest lands]
[project stage P and W]
[passing the state examination]
Development of working documentation on thermal insulation of the reservoirs of the liquid nitrogen fertilizer unit with a capacity of 150,000 tons per year
Design and survey works for the reconstruction and technical re-equipment of the production of cellulose nitrate and powder with the purpose of increasing production capacities (p stage) at FKP «KGKPZ»